Rethinking Construction for Faster, Smarter Builds
For over 40 years, Western Design Construction has been a trusted name in Southeast Idaho. Known for their forward-thinking approach and commitment to quality, they’ve consistently delivered energy-efficient, high-performance residential and commercial builds.
But as with many in the construction industry, they faced a mounting set of challenges:
- Labor shortages
- Rising material costs
- Lengthy build timelines
- Weather-related delays
Western Design needed a way to maintain their standards—without being held hostage by outdated processes. That’s where SnapTight Products came in.
The Breaking Point: Traditional Construction Constraints
Construction has always been a balancing act between time, cost, and quality. But in recent years, the scales tipped:
- Labor Costs Were Climbing: Skilled trades were harder to find and more expensive to retain. On-site framing and forming took too much time and too many hands.
- Timelines Were Slipping: Multiple steps in the traditional foundation and wall system process created long, staggered timelines.
- Weather Was a Wild Card: Exposed materials and long site prep stages increased the risk of delay—and damage.
- Material Waste Ate Into Margins: Conventional framing often leads to cutoffs, mis-measurements, and overages.
Western Design realized they had to innovate or risk falling behind.
The Pivot: Partnering With SnapTight Products
To stay ahead, Western Design turned to SnapTight Products—a company offering integrated building systems designed to reduce labor, speed up timelines, and improve energy efficiency.
SnapTight’s systems aren’t one-size-fits-all. They offered a modular, flexible solution that could integrate into existing workflows while drastically improving performance. With hands-on training and support, SnapTight worked directly with Western Design’s teams to implement a smarter system from the ground up.
What Changed? Everything.
Western Design adopted four key solutions from SnapTight:
- FasTrax Footing & Stem Wall System
Eliminated the need for wood or steel forms. Setup time was cut in half, and concrete pours became faster and more consistent—even in poor weather. - Done Wall Panel System
Pre-framed EPS panels that arrived ready for installation. These reduced framing time by 75% and delivered R-32 energy performance, far exceeding the standard R-19. - Insulated Stucco Panels
Finished exterior panels that are insulated, durable, and install-ready. They created a sealed envelope quickly, reducing exposure and the need for weatherproofing delays. - Upper Cutter Tool
A custom cutting tool for EPS materials. It improved safety, cut accuracy, and cleanliness on site—no mess, no stress.
The Early Results
The impact was immediate.
- A 2,400 sq ft structure was enclosed in just 3 days using SnapTight’s wall panel system.
- Foundation work took only 2 days, even under unfavorable weather conditions.
- Labor needs dropped by 50%, with smaller crews achieving more in less time.
- Material waste was cut in half.
SnapTight didn’t just change the tools—
They changed the tempo of construction itself.
Why This Matters
The construction industry is under pressure. Shortages, inflation, and stricter energy codes mean that builders need to evolve.
SnapTight’s approach gives builders like Western Design:
- Speed without sacrificing quality
- Better energy efficiency for long-term value
- Systems that crews can quickly learn and apply
- A way to standardize success across projects
Read the Full Case Study
Want the full story of how Western Design transformed their building process?
See all the specs, metrics, and real-world photos in the complete case study:
👉 SnapTight x Western Design Case Study